Dam Levels as at 23-April-2021

Dam Levels as at 23-April-2021 DAM NAME FULL SUPPLY CAPACITY CURRENT CAPACITY % FULL (millions of cubic metres) (millions of cubic metres) Kariba 64800.00 30558.2 47.2 Tugwi Mukosi 1802.6 1824 101.2 Mutirikwi 1378.08 1346 97.68 Manyame 480.23 374.12 77.9 Osborne 401.64 261.66 65.1 Mazvikadei 343.815 255.5 74.3 Manyuchi 309.06 309.7 100.2 Manjirenji 274.17 270.08 98.5 …

Start-ups aim to change car battery recycling

Start-ups aim to change car battery recycling  Herald 23/4/2021   Recycling of lead batteries accounts for about two-thirds of the world’s supply of refined lead. A handful of startups are trying to find a new way to recycle used car batteries, using water, chemicals and electricity to produce lead instead of the hazardous, high-heat smelting …