Zesa hints at more power cuts
Zesa hints at more power cuts The Herald 12/1/2022 Herald Reporter Zesa HOLDINGS has warned of more power cuts over the next two weeks to allow the resumption of maintenance work on Kariba Dam. These had been shelved from December 16 during the festive season break, resulting in minimal load shedding. At the same …